Bornel, Saint-Denis

BORNEL

Building Data for Bornel, Saint-Denis

  •  
  • Type: Abbey
  • Affiliation: Benedictine
  •  
  • Region: Picardie
  • Department: Oise
  • Coords: 49.197, 2.2076
  •  
  • Surveyed: 1980-83, 1992

Map

Virtual Tour

Timeline and building units for Bornel, Saint-Denis A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. 
    	    The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. 
    	    Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. 
    	    Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.
X

A 'building unit' is an arbitrary unit of work based on bulk billing techniques used by quantity surveyors. The unit is small enough to provide realistic figures in the small churches without becoming too huge in the large. Six units would pay for one small vaulted bay in an aisle about 3 metres square, or a small first-floor gallery. Such a bay would consist of an external wall with a small window, half of two columns about 3 meters tall, the floor and footings under them and the vault and roof overhead.

info

gray gray 25
1130
gray 20
1160
gray 10
1180
20
1190
gray
1050 1130s 1160s 1180s 1190s 1250

Phases for Bornel, Saint-Denis The building sequence is based on my on-site analysis of the construction history,  
    	    using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications.
    	    The analysis of some of the smaller churches are more approximate than I would like, and need further analysis. 
    	    <p>I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. 
    	    A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign.
    	    One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.
    	    <p>Every phase has been assigned to a decade, so there may be more than one phase in a decade. 
    	    <p>While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. 
    	    This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated. 
    	    <p>Clicking on any of the decade graphics will display all buildings that had work being done during that decade.
X

The building sequence is based on my on-site analysis of the construction history, using the techniques developed on the cathedral of Chartres called toichology, and described in a number of publications. The analysis of some of the smaller churches are more approximate than I would like, and need further analysis.

I have used 'phase' rather than 'campaign' to to identify a contiguous zone with similar elements. A campaign would be defined by recognisable breaks and construction joints in the fabric: there may be a number of phases within a campaign. One benefit is that separate programs by subcontractors, such as carvers, may be isolated, which is particularly useful in complex sections, such as portals.

Every phase has been assigned to a decade, so there may be more than one phase in a decade.

While this is certainly imperfect, it will allow us to explore all the data, including costs, across time. This is an on-going process, so as the data continues to be analyzed, the chronology and costing analysis will be further refined, and the synopsis updated.

Clicking on any of the decade graphics will display all buildings that had work being done during that decade.

Earlier

Phase 1 - Earlier - chapel


South chapel to circular plan
1130

Phase 2 - 1130 - east - 25 Units


Remains of apse with square plan, two crossing capitals and those to eastern window remain; everything else rebuilt.
1160

Phase 3 - 1160 - crossing - 20 Units


Additional work around crossing with capitals and a vault.
1180

Phase 4 - 1180 - s nave piers - 10 Units


South nave arcade, possibly in two campaigns
1190

Phase 5 - 1190 - n chapel - 20 Units


North chapel
Later

Phase 6 - Later - nave, crossing


North nave arcade and crossing inserted